Onitsha-Owerri-Aba Road Highway under HDMI Phase 1
Our Role
Sole Engineering Consultant
Undertook detailed engineering design and technical consultancy services, including road condition assessment, topographical and geotechnical surveys, traffic studies, environmental and social impact studies, bridge and hydrological Design, resettlement planning, preparation of bidding documents, and development of detailed engineering designs to support the successful rehabilitation of the highway. The project was funded by the Federal Government of Nigeria through Federal Ministry of Works.